Abstract:
Purpose: the purpose of this study was to determine the influence of the fairness and equity on
the implementation of constituency development fund projects in Nyeri Town Constituency.
Methodology: This research used descriptive survey research design. The population of target
was 90 project management committee members from both primary and secondary schools that
have benefited from Constituency Development Fund, and fourteen (14) sub chiefs whose areas
have benefited from these projects. Collection of data was done by use of interview as well as
questionnaires schedules. The analysis of the collected data was done by use of statistical
package for social sciences (SPSS) to produce descriptive and inferential statistics. So as to test
the extent of relationship amongst the variables a statistical confidence level of 95% was used.
Results: The study found that fairness and equity had positive and significant effect on
implementation of constituency development fund projects with β = 0.257 at p value 0.001.
Unique contribution to theory, practice and policy: It was recommended that there should be